Executive Summary
Question: Can eight racks of 4x NVIDIA DGX H100 (40.8 kW each, 326 kW total) replace eight 5 kW legacy racks at the east end of rows C and D, facing each other across hot aisle 2, and what must change?
Fails immediately on air
All 8 GPU racks exceed NVIDIA's 30 C limit (up to 47.5 C at C16) and 41 of 64 racks exceed ASHRAE 32 C (57 above 27 C). The hall needs 43.5 m3/s of air; existing units supply 27.3 m3/s.
Hot-aisle containment + 10x CR050
Every rack stays at or below 23.2 C (GPU max 21.0 C) with all units running, and at or below 24.4 C (GPU max 22.0 C) with pod unit D12 failed. With backdraft dampers on rows A/B, the entire hall achieves full N+1 (≤ 24.8 C everywhere). Indicative capex: $0.43M to $0.71M.
Backdraft dampers unlock full N+1
Without dampers, losing existing unit B13 puts 1 legacy rack (A11) at 27.6 C (GPU max 22.6 C). Fitting backdraft dampers on rows A and B cuts B13 failure to 24.8 C with 0 racks above 27 C.
What we recommend: Option 1+
- Contain hot aisle 2: Fit roof panels and sealed sliding end doors over hot aisle 2, with blanking panels and rail seals in every rack.
- Add 6 new CR050 units: Install six 600 mm chilled-water in-row coolers (Liebert CRV CR050 class, 6,000 CFM, 53 kW) at C11, C12, C19, D11, D12, and D19. Six 5 kW legacy racks (30 kW IT) leave the hall.
- Upgrade 4 adjacent units: Replace the four CR040 units flanking the GPU bay (C13, C18, D13, D18) with CR050 class units.
- Fit backdraft dampers on rows A and B + fan controls: Run pod fans on hot-aisle differential pressure control (0 to -2 Pa), run rows A and B fans at 100%, and fit backdraft dampers on the eight rows A and B units so the entire hall achieves full N+1 under 27 C.
Design rule discovered: In the contained pod, installed in-row airflow with the largest unit out should be at least 1.05x the rack airflow at NVIDIA's 157 CFM/kW design figure (Option 1+ gives 1.16x all running, 1.06x with one out). Option 1 (four new units, 0.80x ratio) fails at design GPU airflow with 11 racks above 27 C and GPU inlets hitting 30.5 C. Option 2 (active rear doors) passes with all units running (26.1 C), but puts 5 legacy racks above 27 C (worst 30.5 C) when B13 fails without dampers, still leaves 1 rack at 27.5 C with dampers, and leaves only 0.57 m of hot-aisle clearance on the client layout.
Five decisions required from the operator
- Rack positions: Give up six positions and relocate 30 kW of legacy IT (Option 1+), or keep them with Option 2 (staggered rear doors plus backdraft dampers and untested center cold-aisle containment).
- Confirm 100% GPU airflow with NVIDIA: Obtain DGX H100 airflow at 100% fan PWM and site inlet temperature. If well below 1,601 CFM per system, fewer new units may suffice.
- Rows A and B dampers: Fit backdraft dampers on the eight rows A and B coolers to achieve full hall-wide N+1 (≤ 24.8 C everywhere), or accept 1 legacy rack reaching 27.6 C if B13 fails.
- Site altitude: With sealed doors in audited v3 physics, worst GPU inlet under D12 failure is 22.0 C (22.8 C under B13 failure), giving a 2.2 to 3.0 K margin even against NVIDIA's stricter 25 C limit above 1,000 ft.
- Plant and power: Confirm up to +340 kW N+1 chilled-water plant capacity (+15 l/s), +260 to 290 kW IT UPS/generator headroom, and slab floor load rating (9.8 kN/m2 under 600 mm GPU racks).
Assumptions for Sign-Off
Each line must be confirmed or replaced with actual site data. The final column states what changes if the site differs.
| # | Item | Value Assumed | Basis | If Your Site Differs |
|---|---|---|---|---|
| A1 | Room | 18.0 x 12.6 m, 3.6 m flat ceiling, slab floor, no plenums | Representative | Ceiling return or taller room alters hot-air path: re-run |
| A2 | Rows & aisles | 4 rows of 20 (600 x 1200 mm); cold 1.6/1.8/1.6 m; hot 1.4 m | Representative | Narrower hot aisles rule out facing rear doors (G5) |
| A3 | Existing cooling | 16 Vertiv Liebert CRV CR040 chilled-water in-row units (pos 3, 8, 13, 18) | Representative | Other models require re-rating airflow and coil capacity |
| A4 | Existing fan speed | 88% rated airflow; 20 C supply air | Representative | Result follows airflow ratio (Sec 4.1), not percentage |
| A5 | CR040 datasheet | 46.3 kW net sensible at 35 C ret / 7.2 C water; 3,620 CFM | Vertiv SL-71133 R10/26 | CR040RC web page lists 3,325 CFM (8% lower air ratio) |
| A6 | Chilled water | 7.2 C supply, 5.6 K rise | Rating condition | Warmer water lowers in-row sensible capacity |
| A7 | Legacy racks | 64 x 5.0 kW, 12 K rise (0.35 m3/s each), 320 kW total | Representative | Replace with measured PDU loads by position |
| A8 | GPU racks | 8 x (4x DGX H100, 10.2 kW max) = 40.8 kW/rack at C14-17, D14-17 | Client plan; NVIDIA guide | 800 mm racks shift layout; B200 requires a new study |
| A9 | GPU airflow | 157 CFM/kW = 1,601 CFM/system (3.02 m3/s per rack, 11.2 K rise) | NVIDIA DGX SuperPOD H100 Design Guide | Decides Option 1 vs Option 1+. Confirm 100% PWM flow with NVIDIA (1,105 CFM published at 80% PWM) |
| A10 | Rack leakage | 5% of front face open area (blanking + rail seals), Cd = 0.6 | Upsite AisleLok CFD study | Unblanked racks leak up to 40% recirculation |
| A11 | Failed in-row unit | Open resistive path (K = 20 velocity heads, ~24 Pa at rated flow) | Bounding case (no damper) | Backdraft dampers make row B failures milder (Sec 4.4) |
| A12 | In-row capacity | Linear in (return - water) x airflow^0.8; CR050 on conservative 12.8 C rating | Single-point datasheet | Peak load stays at 92% across all cases; confirm with Vertiv selection |
| A13 | Rear door (Opt 2) | ColdLogik CL23 active door, 415 mm deep, 20 C leaving air | CL23 datasheet | ~45 kW duty at 31 C on-coil; requires ~14 C secondary water |
| A14 | Site altitude | Below 305 m (1,000 ft) | Unknown | Above 1,000 ft, NVIDIA limit drops to 25 C (zero margin) |
| A15 | Plant & power | Spare capacity per Section 6 gates | Unknown | Verify chilled water, electrical, UPS, and slab capacity |
The Hall and the Options
| Case | Changes From Today | Hall Air Ratio (Cooler / Rack) | Contained Pod Ratio (Rows C, D) |
|---|---|---|---|
| Existing hall | None (fans 88%) | 24.1 / 22.1 = 1.09 | - |
| Client plan | 8 GPU racks at C14-17, D14-17; fans 100% | 27.3 / 43.5 = 0.63 | - |
| Option 1 (Issue 1) | Hot-aisle 2 containment; 4 new CR050 at C12, C19, D12, D19 | 38.7 / 42.2 = 0.92 | 25.0 / 31.1 = 0.80 |
| Option 1+ (Recommended) | Containment; 6 new CR050 + 4 CR040 swapped to CR050; A/B fans 100% | 48.8 / 41.5 = 1.18 | 35.2 / 30.4 = 1.16 (1.06 N+1) |
| Option 2 (Rear doors) | Active rear doors on 8 GPU racks (client layout), 20 C leaving, fans 100% | 27.3 / 43.5 (20 C doors) | - |
| Option 2 (Staggered) | Row D GPU racks shifted to D04-07 so doors do not face each other | Same | - |
Every case is judged by the warmest 0.4 m vertical band on each rack's front face against ASHRAE Class A1 (27 C recommended, 32 C allowable) and NVIDIA's 30 C DGX H100 inlet limit (25 C above 1,000 ft).
CFD Findings and Option Ranking
4.1 Existing hall baseline
| In-Row Fan Speed | Air Ratio | Racks > 27 C | Warmest Inlet |
|---|---|---|---|
| 88% (assumed today, v3) | 1.09 | 11 | 30.2 C (D10) |
| 100% (v3) | 1.24 | 0 | 25.8 C (A11) |
Top-of-rack overheating happens whenever total in-row airflow drops below roughly 1.2x rack demand. Raising existing fans from 88% to 100% removes all 11 warm racks in the baseline hall.
4.2 Client plan fails because the hall runs out of air
4.3 Why Issue 1's Option 1 fails at NVIDIA design airflow
Adding only four CR050 units yields a contained pod air ratio of 0.80x at NVIDIA's 157 CFM/kW minimum. The contained hot aisle pressurizes to +55 Pa and pushes hot exhaust out of door and rack leakage paths, driving 11 racks above 27 C and GPU inlets to 30.5 C (exceeding NVIDIA's 30 C limit).
4.4 Option 1+ (Recommended): thermal performance and failure matrix (v3)
| Option 1+ Case (Audited v3) | Warmest Inlet | Warmest GPU | Racks > 27 C | Peak Cooler |
|---|---|---|---|---|
| All running, fans 100% | 23.2 C (A20) | 21.0 C | 0 | 86% (C19) |
| D12 failed (worst pod unit) | 24.4 C (D20) | 22.0 C | 0 | 88% (C18) |
| B13 failed (row B, no damper) | 27.6 C (A11) | 22.6 C | 1 | 87% (C19) |
| B13 failed (backdraft damper closed) | 24.8 C (B16) | 22.8 C | 0 | 87% (C19) |
4.5 Option 2 (Active Rear Doors) and Head-to-Head Ranking
| Criterion | Option 1+ (In-Row + Containment) | Option 2 (Active Rear Doors) |
|---|---|---|
| All running | Pass (all racks ≤ 23.2 C, GPU 21.0 C) | Pass (all racks ≤ 26.1 C, GPU 23.8 C) |
| Pod failure (D12 off) | Pass (worst 24.4 C, GPU 22.0 C, 0 > 27 C) | Up to 29.7 C on pod failure (Issue 2 sensitivity) |
| Row B failure (B13) | 1 rack at 27.6 C; with dampers 0 racks > 27 C (24.8 C) | 5 racks > 27 C (30.5 C); with dampers 1 rack at 27.5 C |
| Rear door water loss | Not applicable | 5 to 11 racks > 27 C (dampers do not help) |
| Worst GPU inlet | 22.8 C (passes 25 C high-altitude limit) | 25.7 C (exceeds 25 C high-altitude limit) |
| Rack positions lost | 6 legacy racks (30 kW relocated) | 0 (4 positions swapped if staggered) |
| Indicative capex | $0.43M to $0.71M | $0.28M to $0.61M (before dampers & center containment) |
| Next-gen GPU path | Air only (B200 requires more air again) | CDU + secondary loop prepares for direct liquid cooling |
Equipment List, Commissioning & Acceptance Test
| Item | Qty | Specification | Location |
|---|---|---|---|
| In-row cooler (CR050 class) | 6 new | 600 x 1100 x 2000 mm, ~342 kg, 6,000 CFM, 53.2 kW net sensible, EC fans | C11, C12, C19, D11, D12, D19 |
| In-row cooler (CR050 class) | 4 swap | Replaces CR040 units flanking GPUs (removed units become spares) | C13, C18, D13, D18 |
| Hot-aisle containment | 1 aisle | Roof panels (~12.4 x 1.4 m at 2.0 m) + two 1.4 m sliding end doors | Hot aisle 2 |
| Blanking & rail seals | Hall-wide | Target leakage at or below 5% of rack face | Rows C, D (all racks) |
| Backdraft dampers (opt.) | 8 | Gravity or motorized damper closing when fans stop | Rows A & B coolers |
| Differential pressure sensors | 2 | Integrated with pod in-row fan control (0 to -2 Pa target) | Hot aisle 2 ends |
| Chilled-water branches | 10 | Isolation valves, flex connections, ~DN100 header extension (+15 l/s) | Rows C, D loop |
| GPU rack power | 32 PDUs | 60 A 415 V 3-phase (43 kW nameplate), 2 per feed, A+B per rack | 8 GPU racks |
Commissioning set points and acceptance test
- Set points: 20 C supply air; rows A and B fans at 100%; pod fans on hot-aisle pressure at 0 to -2 Pa (80% minimum speed); GPU inlet alarm at 27 C.
- Load-bank acceptance test: Run load banks at both 40.8 kW and 3.0 m3/s airflow per GPU position (heat alone does not test airflow shortage). Trip D12, D18, C18, and open containment doors; confirm GPU inlets ≤ 27 C. Trip B13 and verify legacy racks stay below 32 C allowable.
Infrastructure Feasibility Gates (G1 to G9)
Order-of-magnitude hand checks against published typical figures. Confirm each gate against actual building records before ordering hardware.
| Gate | Requirement | Option 1+ | Option 2 (Rear Doors) |
|---|---|---|---|
| G1 Chilled-water plant | IT + fan heat (N+1 chillers) | ~700 kW total (+340 kW upper bound; ~670 kW on pressure control), +15 l/s | ~670 kW total (+310 kW); ~370 kW via secondary loop |
| G2 Water distribution | Piping & dew point | 10 live-loop connections (~DN100 header) | N+1 CDUs + ~14 C secondary loop (avoids door condensation) |
| G3 Electrical & UPS | IT power + PDU redundancy | +256 kW net IT; 4x 60 A 415 V PDUs/rack; confirm 3/6 PSU cap with NVIDIA | +286 kW net IT; same per-rack PDU requirement |
| G4 Fan power & UPS | Thermal ride-through | ~122 kW max fan power; in-row fans & CHW pumps must sit on UPS | ~57 kW in-row + 6.4 kW doors; fans, doors, CDU pumps on UPS |
| G5 Space & clearance | NVIDIA ≥ 0.91 m aisle | Pass (1.40 m hot aisle unchanged) | Fail on client layout (0.57 m); Pass if staggered |
| G6 Rack positions | Zero empty positions today | 6 legacy racks (30 kW) removed from hall | 0 positions lost |
| G7 Floor loading | Slab rating (often 7.2 kN/m2) | 9.8 kN/m2 on 600 mm racks (7.4 on 800 mm); confirm slab | 12.2 kN/m2 with wet door (9.1 on 800 mm) |
| G8 Altitude derating | 30 C ≤ 1k ft; 25 C > 1k ft | 22.0 to 22.8 C worst GPU (passes 25 C limit with 2.2 to 3.0 K margin) | 25.7 C worst GPU (exceeds 25 C above 1,000 ft) |
| G9 Noise | DGX H100 ~98.7 dB(A) | Contained hot aisle becomes hearing-protection zone | Open hot aisle requires hearing protection around bay |
Indicative Cost and 9-Step Live Phasing
Equipment and installation ranges are scaled from published list/street anchors (±50%) and exclude IT hardware, PDUs, UPS, and central chiller upgrades. Top-down sanity bound: published whole-retrofit benchmarks ($2M to $3M per MW including plant) imply $0.5M to $0.8M for 256 kW.
| Cost Component | Option 1+ | Option 2 (Staggered) |
|---|---|---|
| Equipment | 10x CR050 ($0.30M to $0.45M) + containment ($0.03M to $0.06M) | 8 doors ($0.08M to $0.16M) + N+1 CDU ($0.10M to $0.25M) |
| Install, piping, controls | $0.10M to $0.20M | $0.10M to $0.20M |
| Not priced | Blanking, rail seals, pressure sensors, header ext., contingency | Backdraft dampers, center aisle containment, blanking, contingency |
| Total (indicative ±50%) | $0.43M to $0.71M | $0.28M to $0.61M (incomplete scope) |
Live-hall phasing sequence (Option 1+)
Ordered so every intermediate step leaves hall airflow no worse than today:
- 01Survey and sign-off: Confirm Section 2 assumptions, Section 6 plant/slab gates, and order equipment.
- 02Pipework: Fit 10 chilled-water branch valves via hot taps or planned out-of-hours isolations.
- 03Relocate six legacy racks: Migrate C11, C12, C19, D11, D12, and D19 out of the hall.
- 04Install six new CR050 units: Commission in vacated slots; pod airflow now exceeds baseline.
- 05Swap four CR040 units one at a time: Replace C13, C18, D13, D18 while maintaining surplus airflow.
- 06Fit sealing and containment: Install blanking panels, rail seals, roof panels first, end doors last.
- 07Remove eight legacy racks in GPU bay: Migrate 40 kW IT from C14 to C17 and D14 to D17.
- 08Load-bank acceptance test: Run full airflow + heat failure tests before GPUs arrive.
- 09Install and commission the eight DGX H100 racks.
Accuracy, Validation & Solver Method
- Published reference validation: The same OpenFOAM solver setup matched published low-density benchmarks within 1 to 2 K (RISE ICE Module 1 measured fronts 0.29 K MAE; de Boer three-code benchmark 1.0 K MAE). On a third small room's exhaust-side sensors, a related model read 2.5 K low on average and 6 K low at the top of the rack.
- Unverified regimes: None of those reference rooms had 41 kW racks, rear doors, or contained in-row aisles. Accuracy at 41 kW per rack is unverified. Treat single-rack margins under 2 to 3 K as unproven (this applies to Option 1+'s 0.9 K margin to 27 C on D12 failure; it does not threaten the GPU racks' 5 K margin to 30 C).
- Audited v3 physics improvements: Full 0.6 m rack faces preserved (96.7% face area intact, 100% across upper bands 1 to 4; calibrated 0.2 x 0.2 m bottom-corner rack leakage tunnels), sealed 1.4 m containment end doors with calibrated 3% porous door vents verified via live flux read-backs, and tighter SIMPLE pressure-velocity coupling (
consistent yes,p_rgh relTol 0.01). Mass balance closes to ±0.000% and heat balance closes within ±0.20% across all 11 v3 runs. - Grid and transient checks: Baseline v3 runs used 0.2 m cells (~87k to 88k cells, steady buoyant k-epsilon RANS averaged over the last 2,000 of 4,000 iterations). Prior Issue 2 sensitivity checks verified stability across 0.1 m grid refinement (726k cells) and 400 s time-accurate PIMPLE solves.
- Simplifications: Racks are uniform over five height bands; rack leakage is a 5% calibrated resistance path; rear doors hold 20 C leaving air; transient power transfers and humidity are not modelled.
Are you a thermal or data-center engineer?
This entire study was produced with our AI-driven OpenFOAM pipeline. Tell us what looks sharp, what is missing, or send us a messy real layout to benchmark against your existing CFD.